this post was submitted on 01 Nov 2024
16 points (100.0% liked)

UK Rail and Trains

352 readers
1 users here now

Talk about the UK rail network.

founded 2 years ago
MODERATORS
top 3 comments
sorted by: hot top controversial new old
[–] [email protected] 4 points 6 months ago (1 children)

I thought they were already in the process of building the infrastructure at Euston for HS2?

[–] [email protected] 2 points 6 months ago* (last edited 2 months ago)

Previous government intended to cancel the leg to Euston despite all the work already being done to save money, but hadn't confirmed.

It made little sense because they'd already spent a lot of money to build a good amount of it and would've made all of it a waste.

Not to mention, having a high speed line terminate further than the main line it's meant to take pressure from would've defeated the point.

[–] [email protected] 3 points 6 months ago

That photo. The internet has ruined me.