Starbase activities (2025-04-08):
- Apr 5th cryo delivery tally.
- Launch site: Tank farm work continues. The fifth out of six vaporizers is removed, laid down on a trailer for transport. The pump from position 5 (previously in position 2) is removed, and new LOX pump and pump motor are installed in position 2. (ViX 1, ViX 2)
- Work on the roundabout continues. (Gisler)
- Three step-down transformers are delivered. (Gisler)
- Build site: S37's A3:4 section moves from Starfactory to Megabay 2. This will make the ship 17 out of 21 rings tall. (ViX)
- Test tank aft section moves from Starfactory to Megabay 1. (ViX, Golden's thoughts)
- S36 undergoing heatshield work in Megabay 2. (NSF 1, NSF 2)
- Highbay demolition continues. (ViX, Gisler 1, Gisler 2, cnunez)
- Work on the flame diverter for Pad B continues. (Gisler)
- A few panels are removed from Starfactory. (Gisler 1, Gisler 2, Gisler 3)
- B14-2 moves from the launch site to Megabay 1. (NSF 1, NSF 2, LabPadre, ViX 1, ViX 2, ViX 3, Starship Gazer 1, Starship Gazer 2, Starship Gazer 3, Beyer)
- S35's first aft flap is lifted into Megabay 2 for installation. (threelonmusketeers, u/Planatus666)
- Massey's: B17 moves from Megabay 1 to Massey's. (NSF, LabPadre, ViX, Starship Gazer 1, Starship Gazer 2, Starship Gazer 3)
- Tank farm spools up. (ViX)
- B17 cryo testing begins with the methane tank. (ViX, NSF)